Commercial roofing Las Vegas: repair, coatings, replacement

Taking the old roof off and putting back one built for this climate

Full and sectional replacement on valley buildings, with the system chosen for heat and ultraviolet light, the attachment designed for outflow wind, and the drainage corrected while the roof is open.

Get a quoteSee what is included

A roof stripped back to the deck and battens

What is included

A survey that tests instead of guessing

A moisture survey to map where the insulation is wet and cores to establish the layers and the deck. This is what decides whether the whole roof needs doing.

A system specified for the valley

Surface reflectivity, membrane thickness and detail materials chosen for relentless sun and daily thermal movement rather than copied from a national specification.

Attachment designed for outflow wind

Perimeters and corners take the highest uplift, and monsoon outflow arrives fast. Fastening patterns, edge metal and coping are detailed for those zones, not for the field.

Drainage corrected while we are in there

Tapered insulation to build fall, drain bowls reset to the new level, strainers fitted and overflow provision checked against what a storm here actually drops.

Work phased around your operations

Casino floors, tenanted retail, distribution docks and HOA buildings each set different hours and different access. The sequence is agreed before materials are ordered.

A closeout package

Warranties registered in your name, the inspection report, photographs of every detail before it was covered, and a written maintenance schedule for the roof you now have.

How it works

  1. Survey and test the roof

    The surface, the details and the drainage, then a moisture survey. A roof presented to us as a full replacement is often one saturated section and three sound ones.

  2. Scope and system agreed in writing

    The assembly named layer by layer, the details drawn, the exclusions listed and unit rates set for deck and wet insulation, so finding them does not reopen the price.

  3. Permits and program

    We confirm which building department covers the address, because much of what people call Las Vegas is unincorporated county. Inspections are booked into the schedule rather than fitted around it.

  4. Tear off and rebuild in sections

    Only as much roof is opened as can be closed before the crew leaves, and the join between new and old is made watertight every day the job runs.

  5. Inspection and handover

    Drains tested, details walked, the manufacturer inspection completed and the punch list closed before the final payment is released.

Get a quote

What decides the price

Area and how cut up the roof is
The work sits in the details rather than the open field, so a small roof crowded with curbs and units costs more per square than a plain distribution roof.
What comes off
Every existing layer adds labor and disposal. Gravel surfacing and ballast are weight and volume to remove before the membrane underneath is even reached.
Insulation and fall
Thickness is set by code at replacement rather than matched to what was there, and tapered boards to correct drainage cost more than flat ones.
Deck condition
Unknown until the roof is open, and quoted as a rate rather than a lump sum. It is the main reason a replacement price moves after signing.
Rooftop equipment and solar
Units, ducts, screens and arrays all have to be lifted, supported or disconnected, and that brings other trades onto your schedule.
Access, hours and jurisdiction
Crane windows, work through occupied space, night shifts and the permit and inspection requirements of the authority covering the address all change the program.

We price the job after we know these. We do not publish a rate that ignores them, because it would be wrong for most buildings.

Why the drainage decides the specification

A roof here spends most of the year dry and then takes a storm that drops more water in an hour than the outlets have been asked to carry since the last one. That is the load to design against, and it is why we look at the drainage before we look at the membrane.

Tapered insulation is the usual answer where fall is missing, because replacement is the only moment fall can be built. Beyond that we check what the outlets can actually clear, whether the strainers are there, and whether the roof has any overflow provision at all. A parapeted roof with blocked drains and no scupper has nowhere to send water except up, and standing water is weight the structure was not designed to carry.

Getting this right at replacement is worth more than any upgrade to the sheet itself, because the chance does not come round again for decades.

What we specify differently here

Two things the national catalogue does not weight properly. The first is the surface: a reflective finish runs cooler, which slows the chemistry that makes membranes and sealants brittle and reduces the daily movement that fatigues every joint on the roof. The second is the perimeter. Monsoon outflow arrives fast and loads the edges and corners hardest, so that is where the fastening pattern, the edge metal and the coping detail get enhanced, rather than treating the whole roof as one zone.

We also specify walkways as part of the roof rather than as an extra. Service trades will use the shortest route from the hatch to the units whatever anybody says, and on a hot roof that route compresses the insulation and creates the next low spot.

What nobody can price before the roof is open

The deck. It sits under everything, and on a building that has leaked for years there is usually damage somewhere, most often at drains, under long standing ponding and along the perimeter. We quote it as a rate per unit with a rule about who approves the quantity, and we photograph every area we call out before it is covered.

The same applies to wet insulation. The survey maps it, the tear off confirms it, and the difference is settled at an agreed rate rather than by argument on the roof. Any bid that carries no allowance for either is not a cheaper bid. It is an unfinished one.

Common questions

Can a roof be replaced during monsoon season without water getting in?

It is done here every year, and the method is what protects you rather than the forecast. A crew opens only as much roof as it can close before it leaves.

  • Deck dried in, insulation and membrane laid, new work terminated against old
  • A temporary water cut off at the join, rebuilt every day the job runs
  • That join is the detail that decides whether a storm costs you anything
  • Smaller daily areas, and materials on the roof to close an edge fast
  • Somebody watching the radar rather than the calendar

It slows the job, and a contractor who does not want to slow down in summer is taking a risk with your building rather than theirs. Put it in the contract: who is responsible for water entering the work area, watertight at the end of every shift, and notice to you and your tenants if anything stays open.

Does the new roof have to carry more insulation than the old one?

Usually yes. Energy codes are generally written so a replacement brings the assembly up to current standards rather than matching what was there.

  • On an older valley building that often means noticeably more than came off
  • Your building department confirms what applies to your address and scope
  • A thicker assembly raises the finished roof level, which moves other details
  • Flashing heights at parapets, curbs under units, thresholds and drain bowls
  • All of it belongs in the scope at the start, not in a change order later

There is a local argument for going beyond the minimum. Insulation does far more for what this building costs to cool than the color of the membrane does, and the roof takes the worst of the sun. If there is a moment to improve it, this is the only one you get for decades.

Can the work happen at night or outside our operating hours?

Yes, and on a lot of valley buildings it is the only way the job can run. It should still be a deliberate choice rather than a default.

  • Resort roofs sit above guests, kitchens and meeting space
  • Retail centers have trading hours and customer parking to protect
  • Some industrial buildings cannot take a crane over a live yard during shifts
  • Expect it to cost more and take longer, with smaller crews and lighting to set up
  • Some inspections, deliveries and crane lifts still have to happen in daylight

Noise rules vary between the cities and the county, so what is permitted at night depends on which authority covers the address. There is also a summer argument for early starts that has nothing to do with your tenants: midday surface temperatures limit what can be installed at all.

What happens to the rooftop units and the solar array?

They have to be lifted, supported or disconnected so the new assembly can be flashed properly underneath them, and that is usually a mechanical or electrical contractor rather than a roofer.

  • It is the most common reason a replacement schedule slips
  • The curb cannot be rebuilt until the unit is off it
  • Book them before the tear off starts
  • Solar panels, rails and ballast come off and go back by someone qualified
  • Mounting points are flashed into the new roof rather than set back onto it

Expect short interruptions to whatever the units serve, and give tenants dates rather than warnings. The upside is real: the curb under a rooftop unit is where valley roofs leak most, and replacement is the one chance to rebuild those details properly.

Should we replace the whole roof or just the section that failed?

Let the moisture survey answer it. If the wet area is contained and the rest of the assembly is dry and sound, replacing that section is the better use of money, and we will say so.

  • Wetness spread thinly across the field points the other way
  • So does a membrane gone brittle and splitting in several places at once
  • A sectional replacement there moves the problem and you mobilize twice
  • Roofs here fail at the details first, so a sound field with tired flashings is common
  • That roof often wants a detail rebuild and a coating rather than a replacement

A surface consumed by ultraviolet light is a different case and says the material itself is finished. If you do phase the work, build the join between new roof and old as a proper termination that could survive years, not as an overnight tie in.

Get a Vegas quote

Three things and we will call you back. No obligation.

Or call (646) 643-3790